| Version<br>Date<br>Author<br>Description / Changes | |
| 0.1 | 2/19/2024<br>Lion Power<br>Draft Released |
| 0.2 | 4/11/2024<br>Lion Power<br>Added Section for Installation of Removable Panel<br>Safety Switch |
| 0.3 | 7/12/2024<br>Lion Power<br>Added installation checklist to appendix. Added<br>sections for installing equipment to<br>block/brick/concrete walls. Added information<br>about lifting racks from the door side |
| 0.4 | 1/28/2025<br>MWalker<br>Updated Electrical installation section 6 |
| 0.5 | 8/6/2025<br>EOliver<br>Added Sections for alternative “GL-V” Series Light<br>Curtains and Integrated Trim on Operator Mat |